Case Studies

Notre Dame Lab Contractor Taps Simtech for Equipment and Training

We helped a leading mechanical contractor complete a high-profile laboratory piping project on-time and in-budget with specialized fusion equipment, jobsite training and certification. We specialize in helping distributors and contractors with varying degrees of plastics experience successfully quote and install thermoplastic systems. 

Pollution Control OEM Material Solution and Supply

The superior AlphaPlus® polypropylene resin technology makes our pipe and fittings the idea material for components of this OEM’s high efficiency mist eliminators. 

Critical High Purity Water Solutions for Cancer Research

We helped one of the nation’s top cancer research centers improve the purity and performance of their high purity water system by replacing “natural” unpigmented PP with the superior AlphaPlus® polypropylene. 

Highly Corrosive Aqua Regia Fume Exhaust Handled Safely and Efficiently

Simtech mobilized quickly to produce and ship urgently needed flame-retardant ventilation components for a mining laboratory. With our easy-to-install AirTech® system they met their tight installation deadline and increased their system’s energy efficiency.

48-Hour Engineered Solution Prevents Costly Downtime

By helping this industry-leading chemical manufacturer finish a double-containment system in 72 hours, we saved them over $2million in losses due to unplanned downtime.